Performance Test 1
With the AEV starting behind the red line, it had to travel to the first gate and stop in-between the sensors. After 7 seconds, the gate would be triggered and the AEV could continue through.
Performance Test 1
With the AEV starting behind the red line, it had to travel to the first gate and stop in-between the sensors. After 7 seconds, the gate would be triggered and the AEV could continue through.