Location: Hitchcock Hall 224
Time: 3:55 PM–5:15 PM, January 24, 2018
Attendees: Rachel Bobango, Matt Deminski, Jarred Fink, Molly Goergen
Discussion: The team members shared their individual drawings with each other, and a decision was made for the design of the AEV. Jarred and Rachel worked on the programming commands for exercise 4, and Molly and Matt built the AEV. The constructed AEV was tested on the desktop track. It was discussed that next week would see the team finish exercise 4 and make progress on exercise 3 in the meantime between labs.