Performance Testing

 

Team F’s AEV underwent 3 performance tests that prepared it to reach its transportation goal of moving its citizens from Linden to Easton safely. Performance Test 1 consisted of beginning at the loading dock, stopping at the gate for 7 seconds, and then passing through. The second Performance Test consisted of passing through the initial gate, connecting to the cart, and pausing for 5 seconds. The Final Performance Test consisted of the previous test along with stopping at the gate with the cart, and making a final stop at the initial loading dock. Each Performance Test was passed with 100% accuracy by Team F. The following pages describe Team F’s performance Tests in further detail.

Below is the Final Performance Test code as well as the energy analysis from the last run.

Final Performance Test Code.

Final Performance Test energy usage.