Schedule

Task #

Task

Task Description

Due Date

Date Completed

1

Team website creation

Sections of the website to be completed:

-Shared with all companies

-Meeting minutes

-Meet the team members

-Team working agreement

-Team approach

1/18/19

1/11/19

2

AEV structure

Building the AEV

1/18/19

1/18/19

3

Reflectance sensors

-run reflectance sensor code so the sensors run in the right direction

-use data extraction tool to make two required plots

1/25/19

2/1/19

4

Website update 2

-code is up to date

-plots from reflectance sensors are included with explanations

2/8/19

2/7/19

5

Individual AEV designs

Each member of the team is responsible in making their own AEV design

2/11/19

2/11/19

6

Scoring and screening matrices

-scoring matrix

-screening matrix

2/11/19

2/11/19

7

Grant proposal

-grant proposal for a 3D printed nose cone was completed and presented to class

2/15/19

2/15/19

9

Progress report 1

Progress report 1 with findings and results up to this point with meeting minutes was produced

2/15/19

2/14/19

10

Committee meeting 1

Each team member went to their corresponding committee meetings

2/22/19

2/22/19

11

aR&D 1&2

-complete methodologies with data

-conclusion and recommendations based off results

3/8/19

3/7/19

12

Website update 3

-code from first performance test

-individual AEV designs

-screening and scoring matrices

-performance test 1

-aR&D 1&D methodologies

3/18/19

3/17/19

13

Performance test 1

The task was to get the AEV to the gate region to trigger the gate, wait seven seconds, then proceed through the gate

3/18/19

3/20/19

14

Progress report 1

Progress report 2 with findings and results (from performance test 1 and methodologies) up to this point with meeting minutes was produced

3/20/19

3/19/19

15

aR&D Oral Presentation

An oral presentation was given to the company about the team’s findings from aR&D 1 and 2

3/22/19

3/22/19

16

Performance test 2

The task was to complete performance test 1, travel to the loading zone, pick up the caboose, and travel away from the loading zone

3/27/19

3/25/19

17

Committee meeting 2

Each team member went to their corresponding committee meetings

3/29/19

3/29/19

18

CDR draft

A draft of the final project report was turned in with findings, results, conclusions, and recommendations up to this point

3/29/19

3/29/19

19

Final Oral Presentation Draft

A draft of the poster for the final presentation was turned in with every step of the project with team data, findings, and results

4/8/19

4/7/19

20

Progress Report 3

Progress report 3 with findings and results (from performance test 2 and methodologies) up to this point, with budget and energy consumption discussed, and with meeting minutes was produced

4/8/19

4/7/19

21

Final Performance Test

The task was to complete performance test 2, travel back to and trigger the gate, wait seven seconds, proceed through the gate, and stop in the starting dock

4/12/19

4/12/19

22

Final Oral Presentation

An oral presentation to all the companies about the entire project from research, and evolution of design, to performance tests

4/15/19

4/15/19

23

CDR

The final project report was turned in with findings, results, conclusions, and recommendations

4/19/19

4/19/19

24

Final Website

Update evolution of design, codes used, research from aR&D 3

4/19/19

4/19/19