Task # |
Task |
Task Description |
Due Date |
Date Completed |
1 |
Team website creation |
Sections of the website to be completed: -Shared with all companies -Meeting minutes -Meet the team members -Team working agreement -Team approach |
1/18/19 |
1/11/19 |
2 |
AEV structure |
Building the AEV |
1/18/19 |
1/18/19 |
3 |
Reflectance sensors |
-run reflectance sensor code so the sensors run in the right direction -use data extraction tool to make two required plots |
1/25/19 |
2/1/19 |
4 |
Website update 2 |
-code is up to date -plots from reflectance sensors are included with explanations |
2/8/19 |
2/7/19 |
5 |
Individual AEV designs |
Each member of the team is responsible in making their own AEV design |
2/11/19 |
2/11/19 |
6 |
Scoring and screening matrices |
-scoring matrix -screening matrix |
2/11/19 |
2/11/19 |
7 |
Grant proposal |
-grant proposal for a 3D printed nose cone was completed and presented to class |
2/15/19 |
2/15/19 |
9 |
Progress report 1 |
Progress report 1 with findings and results up to this point with meeting minutes was produced |
2/15/19 |
2/14/19 |
10 |
Committee meeting 1 |
Each team member went to their corresponding committee meetings |
2/22/19 |
2/22/19 |
11 |
aR&D 1&2 |
-complete methodologies with data -conclusion and recommendations based off results |
3/8/19 |
3/7/19 |
12 |
Website update 3 |
-code from first performance test -individual AEV designs -screening and scoring matrices -performance test 1 -aR&D 1&D methodologies |
3/18/19 |
3/17/19 |
13 |
Performance test 1 |
The task was to get the AEV to the gate region to trigger the gate, wait seven seconds, then proceed through the gate |
3/18/19 |
3/20/19 |
14 |
Progress report 1 |
Progress report 2 with findings and results (from performance test 1 and methodologies) up to this point with meeting minutes was produced |
3/20/19 |
3/19/19 |
15 |
aR&D Oral Presentation |
An oral presentation was given to the company about the team’s findings from aR&D 1 and 2 |
3/22/19 |
3/22/19 |
16 |
Performance test 2 |
The task was to complete performance test 1, travel to the loading zone, pick up the caboose, and travel away from the loading zone |
3/27/19 |
3/25/19 |
17 |
Committee meeting 2 |
Each team member went to their corresponding committee meetings |
3/29/19 |
3/29/19 |
18 |
CDR draft |
A draft of the final project report was turned in with findings, results, conclusions, and recommendations up to this point |
3/29/19 |
3/29/19 |
19 |
Final Oral Presentation Draft |
A draft of the poster for the final presentation was turned in with every step of the project with team data, findings, and results |
4/8/19 |
4/7/19 |
20 |
Progress Report 3 |
Progress report 3 with findings and results (from performance test 2 and methodologies) up to this point, with budget and energy consumption discussed, and with meeting minutes was produced |
4/8/19 |
4/7/19 |
21 |
Final Performance Test |
The task was to complete performance test 2, travel back to and trigger the gate, wait seven seconds, proceed through the gate, and stop in the starting dock |
4/12/19 |
4/12/19 |
22 |
Final Oral Presentation |
An oral presentation to all the companies about the entire project from research, and evolution of design, to performance tests |
4/15/19 |
4/15/19 |
23 |
CDR |
The final project report was turned in with findings, results, conclusions, and recommendations |
4/19/19 |
4/19/19 |
24 |
Final Website |
Update evolution of design, codes used, research from aR&D 3 |
4/19/19 |
4/19/19 |