600 MHz Progress…

The 600 MHz is being prepared for energizing to field.  First, the vacuum insulation is pumped down with turbo pumps to achieve a high-vacuum (~10-8).

IMAG2709[1]

 

Today, the liquid nitrogen tank is being cooled and filled.  The liquid helium chamber is being pre-cooled to N2(l) temperature.  Tomorrow they will cool and fill the liquid He chamber with He(l).

IMAG2711[1] 

 

Once cooled, the magnet can be slowly energized and brought to field.  This system will require ~5 hrs to energize (assuming no quench), compared with 5-8 days for the 850 MHz.  Once energized, they will spend a day shimming the cryo-temp shims.  The magnet will need a few wks to settle – during this time the console will be installed and tested.