Almost ready…

The 600 MHz system is almost ready for samples.  The service engineer arrives tomorrow to assemble the sample changer and run all the specifications on the BBFO probe.  This should only take 2-3 days which means the system will be ‘ours’ next week.  Check back soon for updates.

IMAG2742

Leave a Reply

Your email address will not be published. Required fields are marked *