For the final performance test no changes were made to the code and the team was pleased with the results. Out of eighteen teams our team came in second place given the constraints of the final performance test. The figure below shows how the last two runs are practically identical, so there is a reasonable level of consistency in between runs.
TOTAL AEV CAPITAL COSTS:
$ 153,040
Standard AEV Parts Total Costs:
$ 152,890
Custom Items for AEV Total Costs:
$ 0
Other Items used for AEV Total Cost:
$ 150 (Rubber band)
Final Cost (TOP 2 AVG)
$ 475,390