The Performance Tests will determine the final section of Research and Development. The team needs to test two different codes and determine the better one after each performance test. Each performance test will have different goals:

Performance Test 1: the team must simple make the AEV to the gate and stop

Performance Test 2: the team must make the AEV stop at the gate, and connect with the load.
Final Performance Test: the team must make the AEV stop at gate, connect with the load, return and stop at the gate again