Budget and Costs

Group M decided to go with AEV design two and performed the final performance test with a code that yielded the results shown below.

  • Final AEV Cost: $158,180
  • Cost of run: $125,000
  • Cost for time of run: $82,500
  • Cost for power: $155,000
  • Cost for baseline run: $90,000
  • Total Cost: $610,650