AEV Design 2 AEV Design 1
For performance test 1, we were required to move the AEV to the gate, wait for 7 seconds and the move through the gate. For the test the group focused on having a good starting code that is consistent so we wouldn’t have any troubles moving on the the following performance tests with one of the AEV design in the pictures above. Team B was able to complete the test smoothly without any mishaps to receive full credit using design 1.