The performance tests are scenarios that the AEV must complete in sequential order that emulate the final task.
Performance Test 1 requires the AEV to complete the first part of the final run, which is traveling along the track, successfully triggering the gate, and proceeding through the gate.
Performance Test 2 includes all of the first test, but now the AEV must travel down the end of the track, safely attach to the caboose, and then travel backwards and out of the loading zone.
Performance Test 3 includes both the first and second tests. After the AEV leaves the loading zone, it must travel through the gate again and then stop where it started at the starting dock.
To see past programs that we a part of developing the final program that the AEV ran for its respective test, *click here