Documentation

There were three primary instances in which our project was documented. These three documents include:

A poster, which describes the six main parts of our project.

The PDR, which documents the initial steps taken while creating and testing various designs for the AEV.

The CDR, which documents all of the final steps taken while finishing the project. All three of these documents are included below.

AEV_Poster

AEV_PDR

AEV_CDR