The team will had two runs to test the final code and AEV design. The best of the two runs was scored. The requirements from the mission concept review is what was scored, which includes traveling to first gate, stopping before gate, waiting 7 seconds, and then traveling to loading zone. At the loading zone, the AEV will wait 5 seconds, connect to cargo, travel to gate, stopping before the gate and waiting and then travel through gate back to the starting position. The energy/mass ratio was also accounted for in the total score.
Final Testing Scoring Sheet: file:///Z:/1182/final%20testing%20sheet.pdf