Meeting Notes

Team Meetings

Meeting #1

Date: 1/18/18

Time: 11:30 A.M

Location: 18th Ave Library

(In person)

Members present: Nick Seneczko, Tian Zeng, Abhishek Vijaykumar, Kritagya Arora

Topics Discussed: Website Update #1

Objective: Complete Website Update #1

Topics Discussed:

-How to make the drop-down menu and what to include in it.

-Strengths and Weaknesses established (in terms of Solidworks, coding, etc..).

-Distribution of workload before lab.

Upcoming Tasks (assigned):

-Abhishek will complete the “Meet the team” page on the website.

-Kritagya will finish organizing the website.

-Nick will update the meeting notes.

-Tian will come up with an approach to the project.

Reflections:

-A lot got accomplished in this meeting.

-Got to know each other better.

-This team works well together and will be able to successfully complete this project.

_______________________________________________________________________________________

Meeting #2

Date: 1/30/18

Time: 11:30 A.M

Location: 18th Ave Library

(In person)

Members present: Nick Seneczko, Abhishek Vijaykumar, Kritagya Arora

Topics Discussed: Website Update #2

Objective: Complete Website Update #2

Topics Discussed:

 

-Distribution of workload before lab to complete the website update #2.

-What needs to be done during the upcoming lab to successfully complete preliminary R&D 1-5.

Upcoming Tasks (assigned):

-Abhishek will upload all individual concept sketches and team sketch. He will also include the explanations behind the sketches

-Kritagya will upload the Arduino code used for scenario 1 as well as upload both the energy vs time and energy vs distance plots. He will also upload the code associated with these plots and explain the figures by describing what the AEV is doing for each section of the plot.

-Nick will update the meeting notes as well as upload both concept screening and concept scoring spreadsheets along with descriptions of the criteria.

-Tian will upload a picture of the AEV sensors and will describe the function of the sensors as well as their importance in completing the MCR.

Reflections:

-A lot got accomplished in this meeting.

-This website update is a little more complicated and all sections need to be divided equally so everything gets done.

_______________________________________________________________________________________

Meeting #3

Date: 2/7/18

Time: 5:30 PM

Location: 18th Ave Library

(In person)

Members present: Nick Seneczko, Abhishek Vijaykumar, Kritagya Arora, Tian Zeng

Topics Discussed: Progress Report

Objective: Complete Progress Report

Topics Discussed:

-Distribution of workload before lab to complete the progress report.

Upcoming Tasks (assigned):

-Abhishek will complete the creative design thinking section.

-Kritagya will complete the programming basics and data analysis tool sections.

-Nick will complete the concept screening and scoring section as well as put everything together.

-Tian will compete the reflectance sensors section.

Reflections:

-A lot got accomplished in this meeting.

-This progress report is a little more complicated than originally thought to be, but now that everything is split up, it seems more manageable.

_______________________________________________________________________________________

Meeting #4

Date: 2/27/18

Time: 5:15 PM

Location: Drackett Tower

(In person)

Members present: Nick Seneczko, Abhishek Vijaykumar, Kritagya Arora

Topics Discussed: Presentation

Objective: Complete advanced research and design presentation

Topics Discussed:

-Distribution of workload before lab to complete the presentation

Upcoming Tasks (assigned):

-Abhishek will complete the alternate propulsion (advanced research and design 2) part of the slides.

-Kritagya will complete the propeller configuration (advanced research and design 1) part of the slides.

-Nick will complete the looking forward and our approach slides.

-Tian will compete AEV overview slide.

Reflections:

-This meeting was very successful.

-The presentation is structured very well and we are excited to present our findings to the class tomorrow.

_______________________________________________________________________________________

Meeting #5

Date: 3/7/18

Time: 8:30 PM

Location: On “Google Hangouts”

(Over the internet)

Members present: Nick Seneczko, Abhishek Vijaykumar, Kritagya Arora, Tian Zeng

Topics Discussed: Progress Report 2

Objective: Complete Progress Report 2

Topics Discussed:

-Distribution of workload before lab to complete the progress report.

Upcoming Tasks (assigned):

-Abhishek will complete the first half of the backward looking summary.

-Kritagya will complete the second half of the backward looking summary.

-Nick will complete the forward looking summary.

-Tian will compete the appendix and will double check everything.

Reflections:

-It was easier to meet on google hangouts online whether then having to meet at an actual location.

-This progress report is a little more complicated than originally thought to be, but now that everything is split up, it seems more manageable.

_______________________________________________________________________________________

Meeting #6

Date: 4/1/18

Time: 8:30 PM

Location: On “Google Hangouts”

(Over the internet)

Members present: Nick Seneczko, Abhishek Vijaykumar, Kritagya Arora, Tian Zeng

Topics Discussed: Progress Report 3

Objective: Complete Progress Report 3

Topics Discussed:

-Distribution of workload before lab to complete the progress report.

Upcoming Tasks (assigned):

-Kritagya will complete the first half of the backward looking summary.

-Abhishek will complete the second half of the backward looking summary.

-Nick will complete the forward looking summary.

-Tian will compete the appendix and will double check everything.

Reflections:

-This progress report is a little more complicated than originally thought to be, but now that everything is split up, it seems more manageable.

______________________________________________________________________________________

Meeting #7

Date: 4/18/18

Time: 8:30 PM

Location: Drackett First floor study room

Members present: Nick Seneczko, Abhishek Vijaykumar, Kritagya Arora, Tian Zeng

Topics Discussed: Final CDR, Final Presentation, and Final Website Update.

Objective: Complete all three listed above

Topics Discussed:

-Distribution of workload before lab to complete what is needed.

Upcoming Tasks (assigned):

-Everyone will update their sections of the CDR that they had completed.

-Nick and Kritagya will work on the final presentation.

-Abhishek and Tian will work on the final website update.