This summer the Prairie staff had a front row seat to a very exciting event. We were able to watch with anticipation as the new prairie shelter house was constructed. Each day while we weeded, collected seeds or mowed the grass we were able to see tiny changes and bits of progress made on the shelter.
The nearly complete shelter was dedicated on September 23rd, 2011. The days before and the morning of were filled with final preparation of the luncheon, displays and the site. Unfortunately, those days were also filled with lots and lots of rain. So much precipitation, in fact, that the newly seeded lawn had been turned into an impassable mud pit. Thanks to the ingenuity of the campus Maintenance department we were able to enter the shelter house safely on a carpet covered plywood ramp. I liked to think that the campus rolled out the (scarlet) carpet for all the luncheon attendees.
The entire campus is proud to have the new Trella Romine Shelter House complete and we invite you to visit the shelter house anytime! Learn more about Trella.
Enjoy these pictures of the construction from start to finish, including the dedication to Trella on that oh so rainy day in September.
[slideshow]
[polldaddy poll=5800170]