Final Performance Testing

On April 12, the team completed their final testing. The team completed with a 94% score. The only way the team could have scored higher would be to have a lower run time or a higher energy efficiency. the team was satisfied with their AEV. The final costs associated, as long as the amount of energy used can be found below in Final Costs. The power vs. time as well as the power vs. plots can be found below as well.

 

Power vs. Time

 

Power vs. Distance

 

Final Costs