Design Project Schedule

The design project schedule was created using a spreadsheet where each assignment was listed out. Along with that, a different team member was assigned to be the primary and secondary lead on each assignment. Additionally, there was a due date along with a turn in date and a start working by date for each assignment. An estimated time was also given depending on the complexity of the assignment. The top image shows how much of each assignment is complete and when it is due. Both charts are update and show which assignments have been completed and how much of remaining assignments have been completed.