Dean Ogle Time Logs

Dean spent most of his time building, constructing, and testing the robot, totaling at 96.5 hours. He averaged 10.7 hours spent per week on the robot project. Dean also did the majority of building and construction compared to other team members.

Tom Ballas Time Logs

Tom mostly worked on testing the robot as well as the code, totaling at 144.5 hours spent. He put in an average of about 16 hours per week into the creation of this project. Tom also did all of the CAD for this project.

Meeting 24

March 9, 2018
3:00 pm
Hitchcock Hall Room 214

Meeting Agenda:

  1. Prepare for Performance Test 4

Meeting Notes:

Tom, Shyon, and Meghan were present. They worked on preparing the robot for Performance Test 4 and tested the robot thoroughly. They attempted Performance Test 4 once, but failed. They decided to regroup after spring break.

Future Actions:

  1. Cut axles so robot doesn’t catch on walls

Meeting 33

April 6, 2018
3:00 pm
Hitchcock Hall Room 214

Meeting Agenda:

  1. Get ready for final competition!

Meeting Notes:

Everyone was present for the last meeting before the final competition. The whole team worked towards testing the robot for the competition, hoping to make it more consistent and as fast as possible. Dean also soldered a bump switch in case one broke on competition day.

Future Actions:

  1. Final Competition!

Meeting 31

April 2, 2018
3:00 pm
Hitchcock Hall Room 214

Meeting Agenda:

  1. Complete second final report draft
  2. Documentation board meeting
  3. Test new skid

Meeting Notes: 

Everyone was present for this meeting. Tom worked on testing the new spoon skid, and Shyon helped with testing this. Dean prepared for and went to the documentation board meeting and brought feedback for the team. He then helped with testing the robot. Meghan worked on and submitted the second final report draft.

Future Actions:

  1. Prepare for final competition
  2. Fix issues with robot

Meeting 30

March 30, 2018
3:00 pm
Hitchcock Hall Room 214

Meeting Agenda:

  1. Individual Competition

Meeting Notes: 

Everyone was present for this meeting. The whole group observed the robot for the individual competition.

Future Actions:

  1. Complete second final report draft
  2. Create new skid
  3. Prepare for board meeting
  4. Fix issues robot had during competition

Meeting 29

March 28, 2018
3:00 pm
Hitchcock Hall Room 214

Meeting Agenda:

  1. Fix problems with robot
  2. Documentation

Meeting Notes: 

Everyone was present for this meeting. Tom worked to help fix the various problems that the robot had. Shyon also worked on these issues and updated his meeting notes from previous meetings. Dean created and updated the testing logs and made some changes to the robot. Meghan worked on the website and documentation, observed robot runs, and brainstormed possible solutions to the robot issues.

Future Actions:

  1. Individual Competition