Work Progress 11/3

Monday (10/30), the train problem was started. We used most of the time to figure out how all of the train commands worked. Friday (11/3) theĀ  procedure was carried out in order, with a final draft. There were a few problems with getting the gate to close but that was easily fixed with changing the command that was written. The train did run at full speed with the lights as they were suppose to.

Leave a Reply

Your email address will not be published. Required fields are marked *