Lab 8

Lab 8 marked the beginning of the end, as it started off the testing process. The team showed up to Performance Test 1 with two designs, Design A and Design B, the squad planned to test in order to ultimately choose the final design. Using eerily similar codes, the team ran each design on the track and gathered data for each design and run. Data that was then processed and to be analyzed later. Lab 8 was where the end began.

Leave a Reply

Your email address will not be published. Required fields are marked *