Lab 08- Test Readiness Review

Before Lab 08, the group had to decide which member will complete certain tasks. The group plans out the next lab by giving each member a task to do during the lab. Micheal would focus on building and maintaining the AEV, Mark and Charles would do testing and collect data, and Zehan would create the solidwork designs. They also decide what they will be testing for and what they will need to do for each test. This helped the group get prepared before the lab starts.

Lab 08- TRR

Lab 08-Preliminary Design Review

During Lab 08, the team tested 2 designs. Design A was the original design chosen during Lab 01 and Lab 03, which was the team concept design. Design B was built to try things that Design A wasn’t doing, like have a vertical base and have propellers facing different sides. Testing for the effectiveness in Power of each design in a Power v Time graph, allowed the group to decide which design would be more efficient for Final Testing.

Lab08-Performance Test 1

 

Design A

Design A

Design B

Design B