Final AEV Design and Costs

Figure 1. The final AEV design. 

The final AEV design, shown above, is lighter than the original AEV, yet it maintains balance. The combination of those factors, lowered time and energy consumption of the vehicle without compromising the safety of the passengers. This lowered overall cost for running the AEV.

The average cost of running the AEV including parts, energy, and time: $636,777.76