Meeting 23 (P)

Week 12 – 4/10/2019 – Meeting 23

Location: HI 224

Time: 8:00-9:20

Members Present: All

Topics:

  • Blade broke on AEV so we had to find a replica blade with the same angle
  • Final Performance Test trial 3 conducted
    • 38/40

Upcoming Tasks:

  • Final Oral Presentation on Monday

Meeting 22 (P)

Week 12 – 4/10/2019 – Meeting 22

Location: HI 308

Time: 8:00-8:55

Members Present: All

Topics:

  • Prepared for Final Performance test
  • Completed final performance test trial 1:
    • 36/40
    • Trial completed after test to finalize code
  • Completed second trial
    • 34/40
    • Need to work on code.

Upcoming Tasks:

  • More testing on Friday

Meeting 21 (P)

Week 12 – 4/8/2019 – Meeting 21

Location: HI 308

Time: 8:00-8:55

Members Present: All but Hayden

Topics:

  • Getting closer to finalizing code
  • Worked on website quite a bit
  • Created solidworks assembly of final design

Upcoming Tasks:

  • More solidworks needs to be done
  • Test AEV quite a bit more

Meeting 20 (P)

Week 11 – 4/5/2019 – Meeting 20

Location: HI 224

Time: 8:00-9:20

Members Present: All

Topics:

  • Collected data for shell 2
  • Worked on code for final performance test
  • Worked on wire management
  • Took video of AEV for website

Upcoming Tasks:

  • Progress Report due Monday
  • Final Presentation Draft due Monday

Meeting 19 (P)

Week 11 – 4/3/2019 – Meeting 19

Location: HI 308

Time: 8:00-8:55

Members Present: Hayden, Pulkit, Bryan

Topics:

  • Tested 1st shell, found it to be obsolete
    • too heavy, back wheel doesn’t sit on track
      • reflectance sensor not able to record properly, no data extraction available
    • shell rubs into AEV arm, arm becomes slanted/off balance
    • didn’t make it over the incline
  • Applied and tested final shell
    • works very well with current chassis, moved battery onto arm instead of having it placed on bottom of vehicle
      • found to be helpful, less swaying during travel
    • top cover does not fit onto shell because of wires, will file a hole into it
      • also sits on shell in a very loose manner, will use tape
    • did not inhibit AEV travel at all, data was recorded properly unlike last design iteration

Upcoming topics:

  • Make some tweaks to AEV shell to have top fit on
  • Further edit code for final performance test
  • Progress Report 3 due Monday

Meeting 18 (P)

Week 11 – 4/1/2019 – Meeting 18

Location: HI 308

Time: 8:00-8:55

Members Present: All

Topics:

  • Research and development methodology 3 – applied the 1st iteration AEV shell to chassis
  • Tweaked code based on track, but did not test
  • Noticeable flaws already with the first AEV shell
    • extremely large and heavy, almost does not fit onto the chassis
    • cannot plug usb cord into the arduino

Upcoming tasks:

  • Test the 1st iteration AEV shell
    • collect data, record results
  • Apply final AEV shell that has just been printed
    • collect data, record

Meeting 14.5 (P)

Week 9 – 3/22/2019

Location: HI 224

Time: 8:00-8:55

Members Present: All

Topics:

  • Presented the teams progress to the board
    • Main problems: battery testing and efficiency, speed testing
    • AEV design modified hea
  • Learned about track dust

Upcoming Tasks

  • PT2 next Wednesday

Meeting 16 (P)

Week 10 – 3/27/2019

Location: HI 308

Time: 7:30-8:55

Members Present: All

Topics:

  • Early to class to work on PT2
  • Added magnet to AEV
  • Worked on PT2 entire class
  • Performed PT3 at 8:30 – worked perfectly

Upcoming Tasks:

  • Committee Meeting 2 on Friday
    • Same roles as last committee meeting
  • CDR draft due Friday – leave blank space where uncompleted items are (PT3)

Meeting 15 (P)

Week 10 – 3/25/2019

Location: HI 308

Time: 8:00-8:55

Members Present: All

Topics:

  • There was an exam the first half of class – loss of lab time
  • Started PT2 trials

Upcoming Tasks

  • PT2
  • Meet early next class to keep trials going for PT2

Meeting 14 (P)

Week 9 – 3/20/2019

Location: HI 308

Time: 8:00-8:55

Members Present: All

Topics:

  • Performed Performance test 1
  • Tried out canoe design

Upcoming Tasks

  • Redesign canoe
    • Cut one side off
    • Hollow inside out
    • Hole for upload cord