Meeting 28 (H)

4/17/19 8:00AM-8:55AM Hitchcock 308

Luke, Louie, Nick, Nathan Present

The group presented the Final Oral Presentation to the class. Nick presented the introduction and the takeaways sections, Nathan presented the design processes and the finances sections, Luke presented the AEV performance section, and Louie presented the final design section.

Meeting 27 (H)

4/15/19 8:00AM-8:55Am Hitchcock 308

Luke, Louie, Nick, Nathan Present

The group completed the Final Oral Presentation. Nick worked on the introduction and the takeaways sections, Luke worked on the AEV performance section, Louie worked on the design processes and final design sections. Nathan completed the Final Cost Spreadsheet and completed the finances section of the poster as well.

Meeting 25 (P)

Week 13 – 4/17/19 – Meeting 25

Location: HI 308

Time: 8:00-8:55

Members Present: All

Topics:

  • Final presentation shown in class
  • Tweaked AEV code for track competition

Upcoming Tasks:

  • CDR and final website due Friday
  • More editing of AEV code for track competition required
  • Turn in AEV kit with list of parts after Monday’s competition

Meeting 24 (P)

Week 13 – 4/15/19 – Meeting 24

Location: HI 308

Time: 8:00-8:55

Members Present: All

Topics:

  • Prepared for final oral presentation, split up parts
  • Worked on AEV competition code

Upcoming Tasks:

  • Final oral presentation next class
  • CDR and final website due Friday

Meeting 26 (H)

4/12/19 8:00AM-9:20AM Hitchcock 224

Luke, Louie, Nick, Nathan Present

The group initially ran some trial runs to ensure the AEV would complete the Final Performance Test. However, the battery that was being used started losing power which made the AEV struggle to get up the hill on the track. The group then switched out this battery for another, but ran into the same problem. Come to find out, the second battery was also about dead. Finally, the group got a third battery and Nick tweaked the code a final time before attempting the last two trials of the Final Performance Test. The Final Performance Tests were then conducted and the group earned a 38/40 for the first run, and a 40/40 for the second run.

Meeting 25 (H)

4/10/19 8:00AM-8:55AM Hitchcock 308

Luke, Louie, Nick, Nathan Present

The group conducted many test runs for the AEV before attempting the first trial of the Final Performance Test. Nick tweaked the code when necessary, and the whole group participated in testing the AEV. The AEV earned a score of 38/40 on the first attempt at the Final Performance Test.

Meeting 24 (H)

4/8/19 8:00AM-8:55AM Hitchcock 308

Luke, Louie, Nick, Nathan Present

The group turned in the Final Oral Presentation Draft Poster and Progress Report 3. Each member contributed evenly to the poster. For Progress Report 3, Nick did the forward looking situation and goals, Louie did the backward looking situation, Nathan did the backward looking takeaways and upcoming schedule, and Luke did the backward looking results and analysis. Each member also worked on the appendices for the Progress Report. After that, the group continued testing the AEV on the track to ensure it would pass the Final Performance Test on Wednesday and Friday.

Meeting 23 (P)

Week 12 – 4/10/2019 – Meeting 23

Location: HI 224

Time: 8:00-9:20

Members Present: All

Topics:

  • Blade broke on AEV so we had to find a replica blade with the same angle
  • Final Performance Test trial 3 conducted
    • 38/40

Upcoming Tasks:

  • Final Oral Presentation on Monday

Meeting 22 (P)

Week 12 – 4/10/2019 – Meeting 22

Location: HI 308

Time: 8:00-8:55

Members Present: All

Topics:

  • Prepared for Final Performance test
  • Completed final performance test trial 1:
    • 36/40
    • Trial completed after test to finalize code
  • Completed second trial
    • 34/40
    • Need to work on code.

Upcoming Tasks:

  • More testing on Friday

Meeting 21 (P)

Week 12 – 4/8/2019 – Meeting 21

Location: HI 308

Time: 8:00-8:55

Members Present: All but Hayden

Topics:

  • Getting closer to finalizing code
  • Worked on website quite a bit
  • Created solidworks assembly of final design

Upcoming Tasks:

  • More solidworks needs to be done
  • Test AEV quite a bit more