Meeting 13 (H)

Meeting 13

3/18/19  8:00AM-8:55AM Hitchcock 308

Luke, Louie, Nick, Nathan Present

With the performance test code now fixed, the AEV was tested on the track three more times to make sure it triggered the first gate sensor successfully. Like usual, the reflective sensor test was performed on Louie’s computer and the performance test code was uploaded through Nathan’s computer. With three successful trials done, the group decided to proceed with the performance test on that day, instead of doing it on the original performance test date of 3/20/19. The performance test was successful. The AEV triggered the first sensor without triggering the second sensor. Then the AEV waited for seven seconds and proceeded through the gate.

Upcoming: Prepare for performance test two.

Leave a Reply

Your email address will not be published. Required fields are marked *