BUSINESS PLAN

CRITICAL DESIGN REVIEW

This is the final report for Engineering 1182, summarizing the entire AEV project.

SALES PITCH

This is the pitch as to why Smart City Columbus to choose Division C’s AEV based on the data from the final performance test

R&D PRESENTATION

The R&D presentation is a power point presentation sharing the Division C’s finding from the first two Advance R&D. This includes data and constraints from the battery voltage and propeller configuration.

GRANT PROPOSAL

The presentation sharing Division C’s initial design explaining how a grant paying for the 3D printed parts needed will help in the development the AEV to maximum potential.

FINAL PRESENTATION

The final presentation shares the overall findings of Division C, focusing on the final design, final test, and how the team came to that configuration.