Final Test

The final test of the AEV was to travel to the gate wait 7 seconds for the gate pick up the AEV travel back through the gate wait another second seconds then stop in the final station with the caboose. The methodology to complete this task was to use the hybrid program with the vertical AEV. To see the results of the test view the tab Results and Recommendations.