These performance tests were completed to measure our progression. We divided the final run into 4 legs:
1: Start to Gate
2: Gate to Loading Zone
3: Loading Zone back to Gate
4: Gate to Stop
Performance test 1 was to get the AEV to travel leg 1 as efficiently as possible. Performance test 2 was to get the AEV to travel legs 1 and 2 as efficiently as possible.