Date | Time | Location | Team Members | Goal |
4/10/2017 | 6-8 pm | Word Doc from home | All | Complete the progress report for lab 11 |
4/12/2017 | 2-3 pm | Hitchcock | All | Finalize code for upstairs track |
4/12/2017 | 2-3pm | Hitchcock | All | Complete the AEV Final Test Evaluation |
4/13/2017 | 6-8 pm | Raney House | All | Finalize CDR presentation and rehearse |
Schedules
Schedule from 3/23 to 4/10
Date | Time | Location | Team Members | Goal |
4/3/2017 | 6-9 pm | Word doc from home | All | Work on Progress Report for lab 10 |
4/4/2017 | 6-9 pm | Presentation from home | All | Complete Oral Presentation Draft |
4/5/2017 | 2-3 pm | Hitchcock | All | Finalize minimal coast code |
4/5/2017 | 2-3 pm | Hitchcock | All | Finalize coasting code |
4/5/2017 | 4-5 pm | Hitchcock | All | Compare energy usage and reliability of different codes |
4/5/2017 | 6-9 pm | Word doc from home | All | Complete Progress Report for lab 10 |
Schedule from 3/9 to 3/23
Date | Time | Location | Team Members | Goal |
3/22/17 | 2-3 PM | Hitchcock | All | Complete code so that the AEV performs all necessary |
3/22/17 | 4-5 PM | Hitchcock | Blake and Alex | Rebuild the AEV to match the second design for testing |
3/22/17 | 7-10 PM | Word document from home | All | Complete Progress Report for Lab 9 |
3/23/17 | 2-4 PM | Hitchcock | All | Test second AEV design and determine which design is better |
3/23/17 | 5-6 PM | Hitchcock | Blake and Alex | Rebuild the AEV (if needed) |
Schedule from 3/2 to 3/9
Date | Time | Location | Team Members | Goal |
3/8/17 | 7-10 PM | Word Doc from Home | All | Complete Progress Report for Lab 8a |
3/9/17 | 2-4 PM | Hitchcock | All | Complete Performance Test 1 |
3/9/17 | 2-4 PM | Hitchcock | All | Complete the Lab Proficiency Quiz (Individually) |
3/9/17 | 6-7 PM | Hitchcock | All | Review future labs and requirements of the AEV |
Schedule from 2/23 to 3/2
Date | Time | Location | Team Members | Goal |
2/22/17 | 7-10 pm | Word Doc from home | All | Complete Progress Report for Lab 6
|
2/22/17 | 7-10 pm | Word Doc from home | All | Complete PDR Presentation worksheet |
2/23/17 | 2-4 pm | Hitchcock | All | Discuss and prepare for the PDR presentation |
2/28/17 | 7-9pm | Hitchcock | All | Prepare and rehearse for PDR presentation |
3/1/17 | 6-8 pm | Hitchcock | All | Final preparations and rehearsal for PDR presentation |
Schedule from 2/16 to 2/23
Date | Time | Location | Team Members | Goal |
2/9/17 | 2-4 PM | Hitchcock | Ashwin and Daniel | Fine tune the code, have the AEV stop at the gate |
2/9/17 | 2-4 PM | Hitchcock | Alex and Blake | Adjust the AEV to match the concept design |
2/15/17 | 7-10 PM | Word Doc from Home | All | Complete Progress Report for Lab 5 |
2/16/17 | 2-4 PM | Hitchcock | All | Conduct a performance analysis of the AEV |
2/16/17 | 6-7 PM | Hitchcock | All | Research how to improve the AEV based on the performance analysis |
2/16/17 | 7-9 PM | Hitchcock | All | Make improvements to the AEV based on the performance analysis and research |
2/22/17 | 7-10 PM | Word Doc from Home | All | Complete Progress Report for Lab 6 |
Schedule from 2/9 to 2/16
Date | Time | Location | Team Members | Goal |
2/7/17 | 7-9 PM | SEL | All | Brainstorm and decide on AEV body design |
2/8/17 | 6-7 PM | SEL | All | Decide and sketch concept design for Progress Report |
2/8/17 | 7-10 PM | Word Doc from Home | All | Complete Progress Report for Lab 4 |
2/9/17 | 2-4 PM | Hitchcock | Ashwin and Daniel | Finetunethe code, have the AEV stop at the gate |
2/9/17 | 2-4 PM | Hitchcock | Alex and Blake | Adjust the AEV to match the concept design |
2/14/17 | 7-10 PM | Word Doc from Home | All | Complete Progress Report for Lab 5 |
Schedule from 2/2 to 2/9
Date | Time | Location | Team Members | Goal |
2/7/17 | 3-5 PM | Google Doc from Home | All | Complete Progress Report for Lab 3 |
2/7/17 | 3-5 PM | Google Doc from Home | All | Correct Progress Report for Lab 2 |
2/7/17 | 7-9 PM | SEL | All | Brainstorm and decide on AEV body design |
2/9/17 | 2-4 PM | Hitchcock | Ashwin and Daniel | Fine tune the code |
Schedule from 1/26 to 2/2
Date | Time | Location | Team Members | Goal |
1/26/17 | 2-4 PM | Hitchcock | Alex | Gather data on the thrust produced by power percentages |
1/26/17 | 2-4 PM | Hitchcock | Alex and Blake | Complete Assembly of basic AEV |
1/26/17 | 2-4 PM | Hitchcock | Ashwin and Daniel | Write basic code for inside and outside track |
1/26/17 | 2-4, 6-8 PM | Hitchcock | Ashwin and Daniel | Decide on sensors for AEV |
1/26/17 | 2-4,6-8 PM | Hitchcock | Alex and Blake | Decide on motor placement on the AEV |
2/1/17 | 7-10 PM | SEL | ALL | Complete Progress Report for Lab 3 |