Time: 2:00pm (Face-to-Face)
Members Present: Blake Kanoy and Alex Beutel
Topics Discussed: AEV Body Design
Objective:
The main focus of the meeting was to adjust and rework the AEV body design to match the concept design that was decided upon in the team meeting on 2/817.
To do/ Action Items:
-Partially deconstruct the original AEV body
-Assemble the decided upon final design
-Inspect the new body and ensure that it matches the design
-Test the new body
Decisions:
-The group decided on the final body design of the AEV
-The group began dismantling and assembling the new body
Reflections:
-The deconstruction took longer than expected due to limitations with tools
-Only having one screwdriver and one crescent wrench limits the ability of the group to work at the same time
-Construction of the new body took longer than expected
-Team did not have time to test the new body and will have to at a later date