This week in lab the team gave a presentation to the class about the progress of the team’s AEV, and the team’s goals for the future. The team included data from all the previous labs and what the team has been able to make of the data acquired. In essence, the team summarized the takeaways from the previous labs and how the team plans to act on it. The team then talked about how it plans to use the skills acquired in previous labs to continue to perfect the AEV design, AEV code, and eventually complete the mission.
The team started off with the mission statement, giving the audience a background on our task and the reason for the construction of the AEV in the first place. The team then went into the development of the design of the AEV and the code. The team then looked to the future and discussed how is going to alter the design of the AEV and code.
Below is the presentation the team gave in class.
Takeaways:
- The team is very good at presenting ideas
- The AEV project is going well
- The team understands what it still needs to do in order to complete the mission
- The team should be able to complete the mission before the semester is over