Final Costs

Final Cost

The final average cost of the AEV was $565,041. The total cost would have been lower if we did not buy the motor from group k, which cost $25,000 itself. The cost also would been lower if the team got a 40/40 on run 1. In run 1 the load just did not properly connect to the load costing the team more money.