Preliminary Design Report

The group’s preliminary design report can be downloaded here: PDRReport_GroupA_7232-25yvhjv

Team Meeting Notes

Date: ​26-March-2017

Time: ​5:00 p.m.

Members Present:​ All

Topics Discussed:​ Complete PDR

Objectives:​ Complete PDR

To do: 

  • Insert individual sections into the PDR
  • Proof read each other sections to ensure quality
  • Turn in PDR

Decisions:

  • The group will begin the CDR report after receiving the grade for the PDR as many sections will be similar.

Reflection:

  • The group is on the right path to creating an AEV that satisfies the MCR.

Below is a detailed team schedule up until the point of the PDR being completed.