Group Q

Meeting 1

Team Q Meeting Minutes

Brooklyn Pugh, Katie Gressley, Annelese Mascoe, Matt D’Andrea

 

When: January 17th, 2018 at 7:00 PM

Location:  The Ohio Union

Attendance:  All Group Members Present

 

Katie suggested to meet up prior to lab this week to start the building of our AEV.  All group members agreed to a time and place.  Katie brought the AEV kit to The Ohio Union.  All group members pitched in to help begin building the AEV.  Matt updated the company’s website with Team Q’s Mission Concept Review.  Annelese downloaded and printed the documents to follow when building the AEV.  Brooklyn took meeting minutes and made sure all discussions were documented.  Our team decided that we would work on smooth acceleration and deceleration of the AEV rather than accuracy of the sensing start and stoping positions.  We thought this would be a better use of our time and materials.

There are many tasks that still need to be handled.  All team members are attending lab this week (Thursday) so we can finish the building of our AEV.  Brooklyn is going to be in charge of keeping our website up to date.  Katie will be in charge of always keeping and bringing the kit to all labs and team meetings.  If she is going to be absent, she will contact another team member to make sure that the team still has access to the kit when needed/wanted.  The team scheduled a meeting for January 24th, 2018 at the same time and place.  Team Q will work with Teams I and O in order to have our website up-to-date by the next Website Update (January 25).  At the next meeting, we will discuss what else needs to be done for Progress Report 1.  Meeting ended at 7:45 PM.

 

Lab 1 & 2

Team Q Meeting Minutes

Brooklyn Pugh, Katie Gressley, Annelese Mascoe, Matt D’Andrea

 

When: January 18th, 2018 at 11:10 AM

Location: Hitchcock Room #224

Attendance: All Group Members Present

 

Since our group already constructed most of our AEV during Meeting 1, we only had to construct the last parts of it during Lab 1&2.  Brooklyn and Katie helped finish the construction of the AEV.  Annelese and Matt coded the AEV.  All parts of the AEV that were tested (propellers and reflectors) worked properly.  See deliverables tab for more detail about the testing and results.

 

Lab 3 & 4

Team Q Meeting Minutes

Brooklyn Pugh, Katie Gressley, Annelese Mascoe, Matt D’Andrea

 

When: January 25th, 2018 at 11:10 AM

Location: Hitchcock Room #224

Attendance: All Group Members Present

 

All group members came to lab with individual sketches of AEV ideas.  Only some sketches were dimensioned so it was discussed that sketches without dimensions would need to be edited before the progress report was due.  We compared individual sketches to each other and decided on features we liked and disliked.  We kept the goal in mind of using as least amount of material as possible to save money while still working properly.  However, when it came time to build the group’s AEV model, more material was used than expected.

For Lab 4, the group made code in preparation of testing our AEV model on the railing. After uploading the code to the Arduino, we first tested the AEV on our table to ensure its safety. Then, we placed the AEV on the railing above the classroom, tested it, and observed its movements for anything that we should consider changing. We noticed a balancing issue and made the necessary changes to ensure it will not happen again. We also evaluate the data using the Analysis Tool on MATlab and made two graphs that evaluates the AEV’s energy usage.

 

Meeting 2

Team Q Meeting Minutes

Brooklyn Pugh, Katie Gressley, Annelese Mascoe, Matt D’Andrea

 

When: January 27th, 2018 at 12:00 PM

Location:  Houck House Lobby

Attendance:  Brooklyn, Katie, and Annelese

 

Our group met at Houck House on Saturday after attending Professor Busick’s SolidWorks help session.  Since our group had not yet completed Labs 3 and 4, our group compared our individual sketches and decided what things we liked and disliked.  We then built our AEV using those factors and sketched a picture of our AEV.  Photos of our individual sketches and the finished group AEV were published onto our company’s website.  Katie was in charge of making sure our AEV had everything that we wanted.  Annelese worked on making the glossary of programming codes we used.  Brooklyn took notes and meeting minutes for the group.  Matt was unable to attend the meeting due to scheduling difficulties.  However, through text messages, he drew a sketch of the new group AEV after it was all built.

Tasks were assigned to each group member that needed to be done.  Brooklyn would update the website with all the group’s individual and team AEV sketches.  She also would post the meeting minutes.  Katie would dissemble the AEV enough for it to fit in the box and bring it to lab on Thursday.  Annelese would post the finished glossary on the website.  Matt would finish the AEV sketch and send a picture to Brooklyn to upload.  Anything else due after lab on Thursday will be discussed in class as needed.  Meeting ended at 1:30 PM.

 

Lab 5

Team Q Meeting Minutes

Brooklyn Pugh, Katie Gressley, Annelese Mascoe, Matt D’Andrea

 

When: February 1st, 2018 at 11:10 AM

Location: Hitchcock Room #224

Attendance: Brooklyn, Katie, and Annelese

 

All group member that were present talked about what factors affect how the AEV runs, looks, and cost.  These included stability, efficiency, amount of material, derability, and safety.  We then looked at each individual drawing and assessed the ratings for all of the categories mentioned above.  However, since our group was running behind and also completed part of Lab 4 during Lab 5, we were not able to completely fill out the matrices.  We planned a team meeting for the following Tuesday to work on filling the matrices out and also completing the progress report.

 

Meeting 3

Team Q Meeting Minutes

Brooklyn Pugh, Katie Gressley, Annelese Mascoe, Matt D’Andrea

 

When: February 6th, 2018 at 6:00 PM

Location:  Houck House Lobby

Attendance:  Brooklyn, Katie, and Annelese

 

Our group met up in the Houck House lobby to focus on getting the progress report finished.  Matt was unable to make it due to band practice, however, he did his part of the report outside of the meeting.  The progress report was split evenly between group members.  Annelese transferred the coding appendix and already made graphs into the report.  Katie began to fill out the screening and scoring matrices based off each of our individual designs and input.  Brooklyn finished typing up meeting minutes for Lab 3&4 and this current meeting.  Matt combined the bullet points discussed by the group in lab for the lab deliverables into easy-to-understand paragraphs.

Outside of the meeting, all members were to go back and dimension their individual sketch if not already done so.  If the member did not finish what they were assigned to get done, they were to finish by 6 PM Wednesday so the report could be completed and reviewed before the turn-in date.  Our group also will plan on using any extra time given in class on Wednesday to work on the progress report.  The meeting ended at 8 PM.

 

Lab aR&D week 1

Team Q Meeting Minutes

Brooklyn Pugh, Katie Gressley, Annelese Mascoe, Matt D’Andrea

 

When: February 8th, 2018 at 11:10 AM

Location: Hitchcock Room #224

Attendance: All Group Member Present

The group began the advanced research and design process this week. When going to begin our first topic, which was coasting versus power breaking, we realized that our AEV design was not balanced enough to start testing. Due to this the team had to spend a considerable amount of time rebuilding and redesigning the AEV. During the last 30 minutes of lab the team was finally able to start testing.

 

Meeting 4

Team Q Meeting Minutes

Brooklyn Pugh, Katie Gressley, Annelese Mascoe, Matt D’Andrea

 

When: February 13th, 2018 at 5:00 PM

Location:  Houck House Lobby

Attendance:  All Group Members Present

 

Our two main topics we spoke about during this meeting were Committee Meeting 1 and the Grant Proposal.  When discussing Committee Meeting 1, the team split up roles to each team member.  Annelese and Matt were in charge of R&D.  They were to be prepared to talk about Progress Report 1 and the topics we would be testing when starting aR&D labs.  Brooklyn was in charge of HR.  She was to be prepared to talk about how the team was working together and how they were going through and solving problems that occurred.  Katie was in charge of Public Relations.  She was to be prepared to talk about the team’s main focuses and the team’s MCR.  When discussing the Grand Proposal, the team came up with a base for the AEV.  It would have a pointed front and vertical (rather than horizontal) wings.  This would allow for less material, meaning less money, and for a more aerodynamic model.  The team put together a powerpoint and Matt prepared to give the presentation to the class during this week’s lab.  The meeting ended at 7 pm.

 

Lab  aR&D week 2

Team Q Meeting Minutes

Brooklyn Pugh, Katie Gressley, Annelese Mascoe, Matt D’Andrea

 

When: February 15th, 2018 at 11:10 AM

Location: Hitchcock Room #224

Attendance: All Group Member Present

 

This week the Matt gave the grant proposal for the team, which was a new AEV base and wings combination. Then the team had their committee meeting in which Annelese and Matt were R&D, Brooklyn was HR, and Katie was public relations for the team. After the committee meeting the team finished testing for coasting versus power breaking. Then they made all the corresponding graphs and tables. After this the team talked about energy analysis, which was the next concept to test, and what they would be doing in that lab.

 

 

Lab  aR&D week 3

Team Q Meeting Minutes

Brooklyn Pugh, Katie Gressley, Annelese Mascoe, Matt D’Andrea

 

When: February 22nd, 2018 at 11:10 AM

Location: Hitchcock Room #224

Attendance: All Group Member Present

 

This week the team ran 10 tests for energy analysis. A new part needed to be added to the AEV in order to not destroy the Arduino during testing. Then the team created the graphs that went along with this data. This concluded the advanced research and design section of the AEV project. After the testing was over we began discussing important points for the presentation next Lab.

 

Meeting 5

Team Q Meeting Minutes

Brooklyn Pugh, Katie Gressley, Annelese Mascoe, Matt D’Andrea

 

When: February 27th, 2018 at 5:00 PM

Location:  Houck House Lobby

Attendance:  Brooklyn, Katie, and Annelese

 

Our team’s main purpose for meeting was to put together the R&D Oral Presentation for lab this week.  The team split up the presentation into roles.  Katie was in charge of creating and presenting the AEV overview.  The biggest focus for Katie was the team’s MCR.  Annelese was in charge of creating and presenting the team’s data for coasting vs power breaking testing.  Matt was in charge of creating and presenting the team’s data for energy analysis.  Brooklyn was in charge of creating and presenting the limitations the team faced during testing and the suggestions and plan for the performance test in the future.  All team members were to be prepared to answer any questions asked at the end of the presentation.  The meeting ended at 7 pm.

 

Lab Week 8

Team Q Meeting Minutes

Brooklyn Pugh, Katie Gressley, Annelese Mascoe, Matt D’Andrea

 

When: March 1st, 2018 at 11:10 AM

Location: Hitchcock Room #224

Attendance: Brooklyn, Katie, and Annelese

 

The group gave a presentation on lab weeks 5-7. They discussed the Advanced Research and development they did and gave an analysis of the results and how they would be used to further the design. They gave a description of power breaking versus coasting and energy analysis to their committee and listened to the rest of their committee’s findings as well in order to know the best ways to move forward with the AEV design.

 

Meeting 6

Team Q Meeting Minutes

Brooklyn Pugh, Katie Gressley, Annelese Mascoe, Matt D’Andrea

 

When: March 6th, 2018 at 5:00 PM

Location:  Houck House Lobby

Attendance:  All Group Member Present

 

Our team’s main purpose for meeting was to put together Progress Report 2.  The team decided that it was best to split up the work in order to get the most work done in an efficient amount of time.  Brooklyn was in charge of making the schedule looking forward and uploading the meeting minutes.  Katie was in charge of the looking forward portion of the report.  Annelese was in charge of the results and analysis for the looking back portion of the report.  Matt was in charge of the summary for the looking back portion of the report.  The team agreed to have their individual parts done by 6 pm on Wednesday to ensure that they had time to review and make any lastminute changes that were necessary before turning Progress Report 2 in.  The meeting ended at 6:40 pm.

 

Lab Week 9

Team Q Meeting Minutes

Brooklyn Pugh, Katie Gressley, Annelese Mascoe, Matt D’Andrea

 

When: March 8th, 2018 at 11:10 AM

Location: Hitchcock Room #224

Attendance: Brooklyn, Katie, and Annelese

 

The team turned in Progress Report 2 before lab started.  During lab, the team started Performance Test 1.  Performance Test 1 requires the team to move the AEV on the track from the starting point to somewhere between the sensors.  The AEV must stop between the sensors for 7 seconds until the gate goes up.  Then, the AEV must continue through the gate.  Annelese worked on the coding of the AEV.  Brooklyn and Katie watched the AEV’s course on the track and determined what needed to be modified.  They also stood in the middle and end of the track for safety measures.

Starting March 19, the team will have lab every class day.  This will give the team more time to perfect and complete their performance test.  Over the next week (during spring break), the team will discuss who will do what for the CDR draft.  However, the team members were not required to start any of their part until after spring break fi they did not wish.

 

Lab Week 10a

Team Q Meeting Minutes

Brooklyn Pugh, Katie Gressley, Annelese Mascoe, Matt D’Andrea

 

When: March 19th, 2018 at 10:20 AM

Location: Hitchcock Room #308

Attendance: All Group Members Present

 

 

The team worked on Performance Test 1 during lab.  Annelese modified the code as needed.  Brooklyn and Matt observed the AEV’s course on the track and suggested any modifications that should be made to the AEV.  They also stood in the middle and end of the track for safety measures.  Katie fixed the AEV as needed and made sure it was always put together properly.  The team was close but did not finish Perfromance Test 1.

The team spoke more on specifics of the CDR draft.  Annelese was to write the discussion portion and upload the code used for Perfromance Test 1.  Brooklyn was to write the Conclusions and Recommendations portion, create the current AEV’s SolidWorks model, and create the schedule for the appendix.  Katie was to write the introduction and experimental methodology portions, create the second AEV design’s SolidWorks model, and create the schedule for the appendix.  Matt was to write the abstract and results portions.  The team agreed to begin on their parts.

 

Lab Week 10b

Team Q Meeting Minutes

Brooklyn Pugh, Katie Gressley, Annelese Mascoe, Matt D’Andrea

 

When: March 21st, 2018 at 10:20 AM

Location: Hitchcock Room #308

Attendance: All Group Members Present

 

The team finished Performance Test 1 during the beginning of lab.  The team received a 20/20 on Performance Test 1.  They then asked the TAs any questions they had about the CDR draft.  The team began preparing for Performance Test 2.  Perfromance Test 2 requires the AEV to stop in the middle of the sensors, sit for 7 seconds, continue through the gate, attach to the load at the end of the track and sit for 5 seconds, and then continue back to the start of the track.  Annelese modified the code as needed.  Brooklyn and Matt observed the AEV’s course on the track and suggested any modifications that should be made to the AEV.  They also stood in the middle and end of the track for safety measures.  Katie fixed the AEV as needed and made sure it was always put together properly.

Outside of lab, team members were working on their portions of the CDR draft.  The team agreed that they would have their portions completed by Friday at midnight.  This left Saturday morning to make any changes to the CDR draft and turn it in by 5 PM.

 

Lab Week 10c

Team Q Meeting Minutes

Brooklyn Pugh, Katie Gressley, Annelese Mascoe, Matt D’Andrea

 

When: March 22nd, 2018 at 11:10 AM

Location: Hitchcock Room #224

Attendance: All Group Members Present

 

The team continued to work on Performance Test 2 during lab.  Annelese modified the code as needed.  Brooklyn and Matt observed the AEV’s course on the track and suggested any modifications that should be made to the AEV.  They also stood in the middle and end of the track for safety measures.  Katie fixed the AEV as needed and made sure it was always put together properly.

Outside of lab, team members were working on their portions of the CDR draft.  The team agreed that they would have their portions completed by Friday at midnight.  This left Saturday morning to make any changes to the CDR draft and turn it in by 5 PM.

 

Lab Week 11a

Team Q Meeting Minutes

Brooklyn Pugh, Katie Gressley, Annelese Mascoe, Matt D’Andrea

 

When: March 26th, 2018 at 10:20 AM

Location: Hitchcock Room #308

Attendance: All Group Members Present

 

The team continued working on Performance Test 2 during lab.  They had the CDR draft that they turned in on Saturday by 5 PM.  Annelese modified the code as needed.  Brooklyn and Matt observed the AEV’s course on the track and suggested any modifications that should be made to the AEV.  They also stood in the middle and end of the track for safety measures.  Katie fixed the AEV as needed and made sure it was always put together properly.

Outside of lab, team members began to prepare for Committee Meeting 2.  Annelese and Matt were in charge of preperation for Research and Development.  Brooklyn was in charge of preperation for HR.  Katie was in charge of preparation for PR.

 

Lab Week 11b

Team Q Meeting Minutes

Brooklyn Pugh, Katie Gressley, Annelese Mascoe, Matt D’Andrea

 

When: March 28th, 2018 at 10:20 AM

Location: Hitchcock Room #308

Attendance: All Group Members Present

 

The team finished Performance Test 2 by the end of the lab.  Annelese modified the code as needed.  Brooklyn and Matt observed the AEV’s course on the track and suggested any modifications that should be made to the AEV.  They also stood in the middle and end of the track for safety measures.  Katie fixed the AEV as needed and made sure it was always put together properly.

Outside of lab, team members began to prepare for Committee Meeting 2.  Annelese and Matt were in charge of preperation for Research and Development.  Brooklyn was in charge of preperation for HR.  Katie was in charge of preparation for PR.

 

Lab Week 11c

Team Q Meeting Minutes

Brooklyn Pugh, Katie Gressley, Annelese Mascoe, Matt D’Andrea

 

When: March 29th, 2018 at 11:10 AM

Location: Hitchcock Room #224

Attendance: All Group Members Present

 

Team members came to lab dressed in business casual attire.  Annelese and Matt respresented the team for Research and Development.  Brooklyn represented the team for HR.  Katie represented the team for PR.  Any time before and after their time slot for Committee Meeting 2 was used to work on Performance Test 3.  Perfromance Test 3 requires the AEV to stop between the sensors for 7 seconds, continue through the gate, attach to the load, sit for 5 seconds, head back to the gate and stop between the sensors for 7 seconds, and continue through the gate.  Annelese modified the code as needed.  Brooklyn and Matt observed the AEV’s course on the track and suggested any modifications that should be made to the AEV.  They also stood in the middle and end of the track for safety measures.  Katie fixed the AEV as needed and made sure it was always put together properly.

Outside of lab, the team members were not required to do anything right then.  However, they should begin thinking about which portions they’d want to do for Progress Report 3.

 

Lab Week 12a

Team Q Meeting Minutes

Brooklyn Pugh, Katie Gressley, Annelese Mascoe, Matt D’Andrea

 

When: April 2nd, 2018 at 10:20 AM

Location: Hitchcock Room #308

Attendance: All Group Members Present

 

Team members worked on completing Performance Test 3.  Annelese modified the code as needed.  Brooklyn and Matt observed the AEV’s course on the track and suggested any modifications that should be made to the AEV.  They also stood in the middle and end of the track for safety measures.  Katie fixed the AEV as needed and made sure it was always put together properly.

Outside of lab, teams members began to work on their portions of Progress Report 3.  Annelese was in charge of data and takeaways for the looking backwards portion.  Matt was in charge of the looking back situation.  Katie was in charge of the forward looking section.  Brooklyn was in charge of the schedule and meeting minutes.  The team agreed to have their portions done by Tuesday at 8 PM so they could use the rest of the night to make any changes necessary before turning it in.

 

Lab Week 12b

Team Q Meeting Minutes

Brooklyn Pugh, Katie Gressley, Annelese Mascoe, Matt D’Andrea

 

When: April 4th, 2018 at 10:20 AM

Location: Hitchcock Room #308

Attendance: All Group Members Present

 

The team turned in Progress Report 3 before lab started.  The team kept working on Perfromance Test 3.  Annelese modified the code as needed.  Brooklyn and Matt observed the AEV’s course on the track and suggested any modifications that should be made to the AEV.  They also stood in the middle and end of the track for safety measures.  Katie fixed the AEV as needed and made sure it was always put together properly.  While there is no exact due date for this perfromance test, the team hoped to have this test completed by lab 13a.

Outside of lab, the team focused on preparing for Midterm 2.  Since this took up a large portion of their time, the team did not focus on anything AEV related and decided they’d start back up the following week.

 

Lab Week 12c

Team Q Meeting Minutes

Brooklyn Pugh, Katie Gressley, Annelese Mascoe, Matt D’Andrea

 

When: April 5th, 2018 at 11:10 AM

Location: Hitchcock Room #224

Attendance: All Group Members Present

 

During lab, the team took Midterm 2.  This did not allow for any time to work on AEV related tasks.  The team will start working on Pefromance Test 3 at the beginning of lab 13a.

Outside of lab, the team began working on the Final Oral Presentation.  Annelese was in charge of aR&D and the graphs for the performance test section.  Katie was in charge of summarizing all of the infromation during performance testing.  Matt was in charge of pR&D.  Brooklyn was in charge of the limitations and errors and the conclusions and reccomendations sections.  The team agreed to have their portions done by Saturday night so they could review it and make any necessary changes before subitting the completed draft.

 

Lab Week 13a

Team Q Meeting Minutes

Brooklyn Pugh, Katie Gressley, Annelese Mascoe, Matt D’Andrea

 

When: April 9th, 2018 at 10:20 AM

Location: Hitchcock Room #308

Attendance: Annelese, Katie, and Brooklyn

 

The team submitted their Final Oral Presentation draft before lab started.  The team worked on completing Performance Test 3.  Annelese modified the code as needed.  Brooklyn and Matt observed the AEV’s course on the track and suggested any modifications that should be made to the AEV.  They also stood in the middle and end of the track for safety measures.  Katie fixed the AEV as needed and made sure it was always put together properly.  The team finished Performance Test 3 by the end of lab.

Outside of lab, the team focused on coming up with any alterations to the code to finish the Final Performance Test.  However, there was nothing specific to complete outside of lab.

 

 

Lab Week 13b

Team Q Meeting Minutes

Brooklyn Pugh, Katie Gressley, Annelese Mascoe, Matt D’Andrea

 

When: April 11th, 2018 at 10:20 AM

Location: Hitchcock Room #308

Attendance: Annelese, Katie, and Brooklyn

 

During lab, the team came close to finishing the Final Performance Test.  However, they were not able to complete it.  The sensors on the track being used stopped working properly and the team had to switch to a new track, setting the team back.  The team used most of the class altering the AEV.  Annelese modified the code as needed.  Brooklyn and Matt observed the AEV’s course on the track and suggested any modifications that should be made to the AEV.  They also stood in the middle and end of the track for safety measures.  Katie fixed the AEV as needed and made sure it was always put together properly.

Outside of lab, the team did not work on anything specific.  Team members did keep in mind that the Final Performance Test was due at the end of lab 13c.

 

Lab Week 13c

Team Q Meeting Minutes

Brooklyn Pugh, Katie Gressley, Annelese Mascoe, Matt D’Andrea

 

When: April 12th, 2018 at 11:10 AM

Location: Hitchcock Room #224

Attendance: All Group Members Present

 

During lab the team worked on finishing their Final Performance Test.  Annelese modified the code as needed.  Brooklyn and Matt observed the AEV’s course on the track and suggested any modifications that should be made to the AEV.  They also stood in the middle and end of the track for safety measures.  Katie fixed the AEV as needed and made sure it was always put together properly.  The team ran 2 final tests, taking a 93/100 as their best score.  The team was very happy with how their AEV ran.

Outside of lab, the team needed to disassemble their AEV.  They also needed to think about working on assignments that had upcoming due dates such as the CDR, Final Oral Presentation, and the Final Website Update.  Saying this, the team agreed they would start on all of these assignments during lab 14a.

 

Lab Week 14a

Team Q Meeting Minutes

Brooklyn Pugh, Katie Gressley, Annelese Mascoe, Matt D’Andrea

 

When: April 16th, 2018 at 10:20 AM

Location: Hitchcock Room #308

Attendance: Annelese, Katie, and Brooklyn

 

During lab, the team turned in their disassembled AEV.  The team also took time to complete the UTA evaluations.  The team split up work for upcoming assignments.

Outside of lab, the team would work on their portions of upcoming assignments.  Each team member’s role for each assignment is as follows:

CDR: Annelese – edit disucssion, upload code for final performance test.  Katie – edit introduction, edit experimental methodology.  Matt – edit abstract, edit results.  Brooklyn – edit conclusions and reccomendations, edit schedule.

Final Oral Presentation:  Annelese – edit aR&D.  Katie – edit performance testing.  Matt – edit pR&D.  Brooklyn – edit limitations and errors, edit conclusions and reccomendations.

Final Website Update: Annelese – create sales pitch.  Katie – create AEV design process.  Matt – N/A.  Brooklyn – upload/edit meeting minutes.

 

Lab Week 14b

Team Q Meeting Minutes

Brooklyn Pugh, Katie Gressley, Annelese Mascoe, Matt D’Andrea

 

When: April 18th, 2018 at 10:20 AM

Location: Hitchcock Room #308

Attendance: All Group Members Present

 

Class was canceled for today.  Team members worked on their portions of upcoming assignments.

 

Lab Week 14c

Team Q Meeting Minutes

Brooklyn Pugh, Katie Gressley, Annelese Mascoe, Matt D’Andrea

 

When: April 19th, 2018 at 11:10 AM

Location: Hitchcock Room #224

Attendance: All Group Members Present

 

During lab, the team gave their Final Oral Presentation.  In the upcoming days, the team will turn in their Final Website Update and the CDR.