Meeting Minutes #10 – #12

Meeting 10:

Date:  March 19th, 2018

Location/Time:  4:10 PM, Hitchcock Hall Room 224

Members Present:  Cory Finger, Mark Ma, Shamik Raje

Topics Discussed:  Performance Test 1

________________________________________________

Objectives:

Today’s main focus was to test the program designed for Performance Test 1. Also the group discussed about different designs of the group AEV design.

________________________________________________

To Do/Action Items:

Meeting Minutes #10:  Mark Ma

Performance Test 1: All

_______________________________________________

Lab Activities

During the lab period the group worked on Performance Test 1, and the program still needed to be modified. The group spent a lot of time figuring out an assembing error on the AEV. Then the group decided on using power braking when approaching the gate. And the position parameter for goToAbsolutePosition method as well as parameters used for power braking were tested.

_______________________________________________

Results and Reflections:

  • The group decided to use goToAbsolutePosition to reach the desired point in the midway instead of goFor method.
  • The group used power braking when stopping the AEV at the gate.

 

Meeting 11:

Date:  March 21st, 2018

Location/Time:  4:10 PM, Hitchcock Hall Room 224

Members Present:  Cory Finger, Mark Ma, Shamik Raje

Topics Discussed:  Advanced Research and Development, Coasting vs. Power Braking, Propeller Configuration, Oral Presentation

________________________________________________

Objectives:

Today’s main focus was to continue testing the program for Performance Test 1 and have it checked. Some changes in the AEV used were also needed.

________________________________________________

To Do/Action Items:

Meeting Minutes #11:  Mark Ma

Performance Test 1: All

_______________________________________________

Lab Activities

Continuing testing the program for Performance Test 1. The group continued using the same running pattern, and tested the optimized parameters for a desired run. At the end the group had the AEV checked.

_______________________________________________

Results and Reflections:

  • Program for Performance Test 1 checked.

 

Meeting 12:

Date:  March 23rd, 2018

Location/Time:  3:55 PM, Hitchcock Hall Room 224

Members Present:  Cory Finger, Mark Ma, Shamik Raje

Topics Discussed:  Performance Test 2, CDR Draft

________________________________________________

Objectives:

Today’s main focus was to change the AEV design and have it pass the performance test 1. Then the group tested on Performance Test 2 and assigned works for the CDR draft.

________________________________________________

To Do/Action Items:

Meeting Minutes #12:  Mark Ma

Performance Test 2: All

CDR Draft: All

_______________________________________________

Lab Activities

The group came up with a new AEV design used for the Performance Test 1, which differed from the first design with a pull-push propeller configuration. The group tested the modified parameters used for the new design. And in the rest of the lab period the group worked on the program for Performance Test 2.

_______________________________________________

Results and Reflections:

  • A new program was designed for the second AEV design on Performance Test 1.
  • The group moved on to Performance Test 2.