For this lab, the team got together to work on the Preliminary Design Report as well as look at what they have learned from all the labs up to this point. Some major take away’s include: coasting being more beneficial, a smaller more sleeker design, as well as how to organize the data that has been collected.
Link to Progress Report: PR8_GroupD
Meeting 09: March 1, 2017, 7:00 PM – 9:00 PM, Houston House, 6th Floor |
||
Team Members: | In Attendance: |
Job/Responsibility: |
Blake Harriman |
X | PDR Practice |
Kyle Kottyan | X |
PDR Practice |
Kyle Pellikan |
X | PDR Practice |
Joe Sudar | X |
PDR Practice |
This meeting was planned in order to practice and rehearse the PDR presentation to make sure that everyone was prepared. The team ran through the presentation multiple times in order to help memorize the information.
Goals for next meeting:
- Present the PDR
- Start working on Progress Report 8
Summary:
- Made sure the PDR was organized
- Practice with the whole group in order to see how long it would be
Notes:
- Each member were tasked with learning their slides
Meeting 10: March 08, 7:00 PM – 9:00 PM, Houston House, 2nd Floor Lobby |
||
Team Members: | In Attendance: |
Job/Responsibility: |
Blake Harriman |
X | Scenario coding |
Kyle Kottyan | X |
Meeting leader, organizer |
Kyle Pellikan |
X | Meeting Notes/Website |
Joe Sudar | X |
AEV Design, SolidWorks modeling, Scheduling |
This meeting was called to finish Progress report 8. The team discussed altering the website portfolio, as well as different ideas of how to run the AEV along the track. The team also discussed what material will be over the Lab proficiency quiz as well as what to study for it.
Goals for next meeting:
- Prepare for Lab Proficiency Quiz
- Turn in Progress Report 8
Summary:
- The team discussed what they learned from the prior lab.
- Discussed how to fix their organizational issues.
Notes:
- The website was cleaned up more in order to make it easier to navigate
Date: |
Location: | Time: | Blake H. | Kyle P. | Kyle K. | Joe S. |
March 5, 2017 | Houston House: 2nd Floor Lobby | 1:00 pm-
3:00 pm (2 hrs.) |
Meeting notes, PT prep(code) | PT Prep (efficiency of design) | PT Prep (Code) |
PT Prep (design), solidworks model |
March 8, 2017 |
Houston House: 2nd Floor Lobby | 7:00 pm-
9:00 pm (2 hrs.) |
Backwards looking section Progress Report 8 | Meeting note, Update u.osu website | Forward Looking Section Progress Report 8 | Weekly Schedule, Weekly goals Progress Report 8 |
Weekly Goals
1 |
Determine future actions based on Performance Test 1 |
2 |
Develop a model of the AEV design in Solidworks |
3 |
Construct various AEV Arduino scripts to work for further energy analyses |
4 |
Determine which part design will be laser cut or 3-D printed |