Performance Test 4: Final Testing

 Performance Test 4: Final Testing

The final testing for AEV’s occurred during this lab. Each vehicle must meet the requirements for traversing the track as well the energy/mass ratio. The key takeaway from this lab was how important it is to compare data obtained before and after a change is made to the design of a product. By doing this, it is easier to decide whether the change helps or hinders the product.

Table 8: Week 11 schedule

Task Teammates Start Date Due Date Time Needed
Improve AEV code for efficient energy use Andy and Grant 4/7/17 4/6/17 30 min
Lab 11 Progress Report All 4/7/17 4/10/17 3hrs
Improve AEV Return Code All 4/6/17 4/15/17 45 min
Bonus Video All 4/10/17 4/20/17 4hrs
Start CDR All 4/10/17 4/20/17 10+ hrs