… the planned updates to the wet lab on Fry 3 include the installation of a walk-in cooler? This will replace the current refrigeration dedicated to research in operation.
… the planned updates to the wet lab on Fry 3 include the installation of a walk-in cooler? This will replace the current refrigeration dedicated to research in operation.