Performance Tests Code

Performance Test 1

Using the above code, we attempted the performance test of reaching the gate and passing through. Unfortunately, not everything went according to plan, and there were some minor errors in the performance of the code. The team aims to correct that and learn from this experience in order to produce a successful AEV.

Performance Test 2

This is the code that the team used for Performance Test 2. The power settings and number of mark to apply the servo brake were optimized to stop within the boundaries of the test.

Final Performance Test

This is the code used for the Final Performance Test. It is an extension of the Performance Test 2 code. The power settings were also increased to decrease the overall time of the mission and joules used in attempt to stay within the budget.