Performance Test 1
- Goal: Performance test one required the AEV to travel from the starting dock to the gate sensors, pause for seven seconds, and travel forward.
- Video:
Performance Test 2
- Goal: In performance test 2, we are required to guarantee the AEV to have enough power to travel to the loading zone, which is located at the end of the railing. It must connect to the load, pause for five seconds, and then travel in reverse out of the loading dock.
- Video:
Final Performance Test
- Goal: This requires the AEV to complete the entire route on the track, which will involve programming it to travel in reverse from the loading zone to the gate, pause for seven seconds, and proceed through the gate with the load attached. It also needs to be completed accurately and efficiently to meet the team key priorities, which are safety and efficiency.
- Video: