Final Performance Test:
- The final test is an aggregation of the previous two tests with a final step to return to the start.
- Also had to pull caboose back through the second half of the course.
- The AEV completed the course in an average of 64.74 seconds.
- The AEV consumed an average of 341.78 Joules of energy.
- Completed the course without human intervention consistently.
Total Cost:
- The total cost of all parts used was $151,423
- Using the cost formula from the MCR Deliverables, the total cost of an average run was $495,747
- The overall cost of the project was $1,142,917.58
Videos of Final Tests:
First Performance Test
Second Performance Test
Third Performance Test