Click the link below to check out the first performance test.
The first performance test requires the AEV to travel up the incline from the starting point, and stop at the gate and wait for a set amount of time before the gate opens. The toughest part about this test is getting the AEV to come to a complete stop at the right place. Team L was able to do this, which set up success for the succeeding performance tests.